dilapidation
英
美
n. 破损;崩塌;荒废
BNC.33264 / COCA.40504
英英释义
noun
- the process of becoming dilapidated
- a state of deterioration due to old age or long use
双语例句
- The characteristics of the packed goods are convenient storage, not dilapidation easily and lowering the packaging cost.
包装后的物品具备储运方便,不易破损,降低包装成本作用。 - The damage analysis and suggestions for the houses in the disaster area of Peng Zhou after dilapidation assessment
对彭州灾区房屋评估后的震害分析及建议 - Inly introduce geologic prospecting, plan selecting, punching blast design, main points of construction technique during disposing the large volume of bottom empty mined area by the way of dilapidation using long deep-hole blast with joint stairs, and the achievements after blasting.
主要介绍用并台阶长深孔爆破崩落法处理底部大容积采空区过程中的地质勘探,方案选择、穿爆设计、施工技术要点,以及爆破后取得的成果。 - Investigation on Abrasion and Dilapidation Mechanism of Cemented Carbide Tool and Coated Tool in Process of Dry Milling High-strength Steel
硬质合金及涂层刀具干铣削高强度钢的磨破损机理研究 - Based on the theory of combination beam, the formula of nature frequency is deduced for the free RCB. Based on calculus of variation, the approximate formula of lower rank nature frequencies is deduced for the free RCB with local dilapidation of concrete.
对于两端自由健康钢筋混凝土梁,基于组合梁理论,推导了其固有频率的解析计算公式;对于两端自由局部破损钢筋混凝土梁,基于变分法推导了其低阶固有频率的近似解析计算公式; - According to the actual requirement of highway maintenance, the paper designs the idiographic system functions and expounds the realization process by Visual Basic, including such key technologies as image display, image enlargement and restoration, confirmation of scope of pavement dilapidation and calculation of polygon area.
根据公路养护工作的实际需要,对系统的功能进行具体的设计,并阐述了图像显示、图像放大和恢复以及路面损坏范围确定和多边形面积计算等主要关键技术的VB实现过程。 - An Introduction to Computer Expert System& New Evaluation Methods of the Dilapidation
计算机专家系统介绍&评估钢筋混凝土结构破损的新方法 - Model for dilapidation mechanism of riverbank
河岸崩塌机理的理论模式及其计算 - System of Data Collection and Evaluation of Pavement Dilapidation Based on VB
基于VB的路面破损数据采集与评价系统的开发 - Roof stress-distribution and surface subsidence rock movement are studied respectively by 3D FEM code ANSYS before and after ore pillar dilapidation and roof cutting.
应用三维ANSYS有限元程序研究了切顶与矿柱崩落前后顶板的应力分布状态和岩体移动情况。