PMS
英 [ˌpiː em ˈesː]
美 [ˌpiː em ˈesː]
n. 月经前综合征,月经前紧张(全写为premenstrual syndrome及premenstrual tension)
Collins.1
牛津词典
noun
- 月经前综合征,月经前紧张(全写为premenstrual syndrome及premenstrual tension)
physical and emotional problems such as pain and feeling depressed that many women experience before their period (= flow of blood) each month. PMS/PMT are abbreviations for premenstrual syndrome/tension .
柯林斯词典
PMSis an abbreviation for (缩略=)premenstrual syndrome.
双语例句
- The basic model is useful to the PMS distribution vision.
这个基本的模型对PMS发布显示很有用处。 - The PMS needs a mechanism for the report execution service to access that policy setting.
PMS需要报告执行服务访问那个策略设置的机制。 - PMs sometimes leave the meeting with more requirements added to the backlog than they implemented in the current iteration!
项目经理有时会将比当前迭代中执行的需求更多的需求添加到未完成的工作单中! - Emotions experienced during PMS can trigger excessive drinking and lower alcohol tolerance levels.
月经前不快症状的情感体验会引起过度喝酒,并降低酒精承受力。 - They can help regulate menses and reduce PMS.
他们可以帮助调节月经,减少经前综合症。 - Unfortunately, many "agile RUP" PMs don't change their behavior, or set appropriate expectations, as they move from iteration to iteration throughout the lifecycle.
不幸的是,许多“敏捷的RUP”项目经理并不改变他们的行为,或者设置适当的期望,他们在整个开发周期中总是从一个迭代移动到另一个迭代。 - IT architects can read it in order to understand project managers'expectations, while PMs can read it to learn more about RUP and IT architecture.
IT架构师为了了解项目经理的预期可以阅读本文,而PM可以阅读本文,从而了解更多关于RUP和IT架构的内容。 - PMs drive people and process, and usually have ultimate authority over the success of the project.
项目经理推动人和过程,他们通常对项目的成功举足轻重。 - The paper presents a Bayesian networks ( BN) framework for the reliability analysis of phased-mission systems ( PMS), named PMS-BN model.
针对多阶段系统(PMS)的可靠性评估问题,提出了一种基于贝叶斯网络(BN)的可靠性分析模型PMS-BN。 - Frequently in my conversations with PMs I hear uncertainty and hesitation regarding the application of project management tasks on RUP projects.
在与PM的经常的对话中,我听到了关于在RUP项目上应用项目管理任务的不确定性和犹豫。
